San Jose |
Code of Ordinances |
Title 20. ZONING |
Chapter 20.100. ADMINISTRATION AND PERMITS |
Part 10. ADMINISTRATIVE PERMIT |
§ 20.100.1210. Application - Utility structure.
In addition to the requirements of Section 20.100.110, an application which includes a utility structure shall be signed by the utility provider. The utility provider shall submit the following with the application:
1.
Evidence that the utility provider has provided, at least ten days' prior to application submittal to the city, written notice to the owner(s) and occupant(s) of the underlying residential real property for which the application is submitted, and all owners and occupants of residential real property abutting that residential real property, which notice includes of all of the following information:
a.
The location for the placement of the utility structure; and
b.
The physical dimensions of that utility structure; and
c.
The anticipated dates that work will be occurring on the real property, together with the nature and length of any service interruptions that may affect the residential real properties receiving the notice required pursuant to this section; and
d.
A current and valid phone number of a contact person for the utility provider who will be available during specified reasonable hours and can be contacted if issues arise in connection with the utility structure; and
e.
Notice that the utility provider is first required to obtain an administrative permit from the city for the utility structure prior to commencement of construction.
2.
Evidence of the private, public utility or public service easement; and
3.
A comprehensive network plan showing the locations of each utility structure planned by the provider.
(Ords. 26248, 28828.)