§ 24.02.520. Required building inspections.
The building official, upon notification, shall make the following inspections:
A.
Foundation inspection. To be made after excavations for footings are complete and required reinforcing steel is in place. For concrete foundations, required forms shall be in place prior to inspection. All materials for the foundation shall be on the job, except when concrete is ready-mixed in accordance with approved nationally recognized standards, the concrete need not be on the job. When the foundation is to be constructed of approved treated wood, additional inspections may be required by the building official.
B.
Concrete slab or under-floor inspection. To be made after in-slab or under-floor building service equipment, conduit, piping accessories and other ancillary equipment items are in place but before any concrete is placed or floor sheathing installed, including the subfloor.
C.
Protection of joints and penetrations in fire resistive assemblies shall not be concealed from view until inspected and approved.
D.
Frame inspection. To be made after the roof, framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing, and heating wires, pipes, and ducts are approved.
E.
Lath and/or wallboard inspection. To be made after lathing and wallboard, interior and exterior, is in place but before plaster is applied or before wallboard joints and fasteners are taped and finished.
F.
Final inspection. To be made after finish grading and the building is completed and ready for occupancy or use.
(Ord. 28166.)