San Jose |
Code of Ordinances |
Title 20. ZONING |
Chapter 20.80. SPECIFIC USE REGULATIONS |
Part 21. STAND-BY/BACKUP ELECTRICAL POWER GENERATION |
§ 20.80.2000. Intent. |
§ 20.80.2010. Permit required. |
§ 20.80.2020. Administrative permit for stand-by/backup equipment. |
§ 20.80.2030. Criteria and standards. |